The time and cost of maritime routes between Costa Rica and China, and the capacity that the food industry develops to take advantage of existing opportunities, are factors that in the coming years will influence the evolution of the FTA signed between the two countries.
Ten years after the entry into force of the Free Trade Agreement between China and Costa Rica, Costa Rican authorities assure that they are in a continuous negotiation process involving the National Animal Health Service (Senasa) and the State Phytosanitary Service (SFE).
Arguing that three inconsistencies were detected, the General Comptroller's Office of Guatemala ordered to temporarily suspend the bidding of the contract for the improvement of the breakwaters of Port Quetzal.
This is the public tender called "Improvement of Port Infrastructure East and West Breakwaters", which on March 3 was awarded to the company Supervision, Construccion y Mantenimiento, S.A., for $62 million.
Due to the imbalance in world trade flows, shipping lines have changed their routes and prefer to move empty containers to Asia, a situation that generates shortages and causes increases in freight rates and raw material prices.
In this scenario of new commercial reality, the operating costs of maritime freight have been impacted, since due to the restrictions imposed in several countries around the world, containers have been stranded.
The Panama Maritime Authority tenders the operation services of the Balboa Shipyard facilities, which includes the rehabilitation, development and administration of the site, for a 20-year term.
Panama Government Purchase 2021-2-03-0-08-08-LV-008104:
As of December 15, the X-ray module began operating in the Guatemalan maritime terminal, which will serve to inspect, in a non-intrusive manner, the contents of the containers that are used to import and export goods.
The regulations that will apply for these non-intrusive verifications were published in the Diario de Centro America. The implementation of this system is an indispensable requirement for the certification of ports by the Coast Guard in national security issues and by the tax collector.
Dohwa Engineering, a South Korean firm, will be in charge of the feasibility study for the expansion of the maritime terminal in El Salvador.
The feasibility study for the Development Plan of the Port of Acajutla, will provide technical guidelines to execute the necessary investments, expand and upgrade its facilities, in addition to improving the operational efficiency of the port.
In order to ensure the supply of drinking water supply to half of the Panamanian population for the next 50 years, achieve water sustainability in its operations and guarantee its competitiveness, the Panama Canal will invest $2 billion.
In Honduras, tugging services are being tendered for the execution of docking and undocking of ships, for the maritime terminals of Cortés, Omoa, Tela and San Lorenzo.
A few days before the expiration of the crane service contract in Guatemala's Port of Santo Tomas de Castilla, local exporters expect a possible scenario of rising costs and slower operations.
The crane service contract was in force for 10 years and will expire on September 6.
After the Quetzal Port Company of Guatemala and the Port of Chiapas, Mexico, signed an agreement for strategic commercial promotion, it is expected that in May the short sea route will begin to operate.
The potential offered by the Port of Chiapas as a logistic node for commercial exchange from and to Central America, as well as with other international markets, makes it a strategic place for the promotion of the Short Sea Shipping (SSS) project with Guatemala and eventually with other Mesoamerican countries, informed the Mexican Secretariat of Communications and Transport (SCT).
In Costa Rica, exporters insist that rates be renegotiated at the Moin Container Terminal, since currently the cost of moving a container at that terminal exceeds by about $207 what was paid at the Japdeva docks.
The president of Guatemala offered the neighboring country to explore the possibility of El Salvador having a maritime cargo terminal in the Guatemalan Atlantic, a proposal that generates doubts among exporters.
The announcement was made on January 27th, during a meeting between Alejandro Giammattei and Salvadoran President Nayib Bukele, on the occasion of the signing of the open skies agreement.
Between January and November 2019, the national port system continued to record positive numbers, as 85 thousand metric tons of cargo were mobilized, a figure 11% higher than that reported for the same period in 2018.
The General Comptroller of the Republic reported that only last November there was a 10% year-on-year increase in cargo movement, rising from 7.5 million metric tons in the eleventh month of 2018 to 8.2 million metric tons in the same period in 2019.
The Panama Chamber of Commerce requested the Panama Canal Authority to postpone the start of collection of the fee for the use of fresh water in the Canal, which would begin to be paid on February 15, 2020.
Between January and October 2019, the national port system mobilized 77 thousand metric tons of cargo, a figure 11% higher than that reported in the same period of 2018.
According to figures from the General Comptroller of the Republic only last October reported a 3% year-on-year increase in cargo movement, rising from 7.5 million metric tons in the tenth month of 2018 to 7.8 million metric tons in the same period of 2019.