The Panamanian Chamber of Solar Energy is inviting domestic and foreign companies in the sector to join this new union.
From a statement issued by the Panamanian Chamber of Solar Energy:
Panama March 16, 2016. A group of leading entrepreneurs in the clean and renewable energy sector have announced the creation of the Panamanian Chamber of Solar Energy (Solar Chamber) with the purpose of promoting solar energy in the country.
The tariff proposal of the Public Services Authority for large-scale solar power generation establishes that plants of more than 1 MW can sell each Kw / h between $0.0751 and $0.1794.
From a statement issued by the Regulatory Authority for Public Services (ARESEP)
ARESEP proposes rates to promote solar generation
The Regulatory Authority for Public Services (ARESEP) has proposed a price band for new companies that produce electricity on a large scale using solar power (photovoltaic), up to 20 MW.
The state run power company is preparing a contest to award two private plants with a contract for the supply of 5 MW solar power each.
From a statement published in the Official Newspaper of Costa Rica, La Gaceta :
The Instituto Costarricense de Electricidad (ICE) wishes to communicate to those interested in participating in the sale of electricity generation, under Chapter I of Act No.
The intense media apparatus unleashed by solar panel producers should not make us avoid the necessary analysis of the real possibilities currently offered by this technology for homes.
In addition to the cost of purchasing and installing a solar panel, the climatic conditions of our tropical countries must be taken into account and the amount of energy this form of alternative energy produces during wet periods.
The tender conditions are available for prequalification for the installation of a photovoltaic plant of 14.2 MWp.
From an article published by The Executive Hydroelectric Commission of the Lempa River:
The Executive Hydroelectric Commission of the Lempa River reported that the conditions for prequalification for the project for the installation of a photovoltaic generation plant with an estimated capacity of 14.2 megawatts peak (MWp) in the vicinity of "Central Hidroeléctrica 15 de Septiembre ", will be available until March 7, 2013.