The Rio Lempa Hydroelectric Executive Commission is tendering the supply of goods and services for preventive maintenance every 10 years for unit 2 of the 15 de Septiembre hydroelectric plant.
El Salvador Government Purchase CEL-LP 06/20:
"It will be considered that for the supply of goods and contracting of the requested services, they are integral; that is to say, after the provision of the requested supervision services, the systems of turbine speed regulator, thrust bearing lifting, upper, intermediate and lower bushings of distributor blades, distribution valves for impeller blades and distributor blades and carbon seal, will be fully functional and will operate in a satisfactory manner for CEL.
The Hydroelectric Executive Commission of the Lempa River tenders the supply of turbine speed regulators for the 5 de Noviembre power plant.
El Salvador Government purchase CEL-LP 01/20:
"The turbine speed regulator system will include: digital turbine speed regulators, fully compatible with the main and auxiliary equipment existing in the generating units, especially with the governor's hydraulic actuator system.
The Lempa River Hydroelectric Executive Commission tenders the modernization of fire detection, alarm and extinction systems for the five machines of the 5 de Noviembre Hydroelectric Power Plant.
El Salvador Government Purchase CEL-LP 18/19:
"The scope of this project consists of the design, supply, installation, commissioning, training and certification of a Fire Detection, Alarm and Extinction System at the 5 de Noviembre Hydroelectric Power Plant.
The Hydroelectric Executive Commission of the Lempa River of El Salvador tenders the supply of a set of air and oil heat exchangers for the generators of the 5 de Noviembre Hydroelectric Plant.
El Salvador Government Purchase CEL-LP 22/19:
Acquisition of a full set of air-water and oil-water heat exchangers for Generating Units 1, 2, 3, 4 and 5 of the 5 de Noviembre Hydroelectric Plant.
Empresa Nacional de Energía Eléctrica de Honduras tenders the supply, installation, testing and commissioning of specialized equipment for the Francisco Morazán Hydroelectric Power Plant.
Honduras Government Purchase PRRCH-61-LPI-O-:
"Supply, Installation, Testing, Commissioning and After-Sales Service of Four (4) Digital Static Excitation Systems for Synchronous Generator and (4) Excitation Transformers for the Francisco Morazán Hydroelectric Power Plant.
A tender is being launched in El Salvador for construction of waterproof screens, dam drainage, spillway and stilling basin, at the hydroelectric plant El Chaparral.
El Salvador Government Purchase CEL-LP 06/17:
"The tender is for the construction of civil works for a spillway and stilling basin at the Hydroelectric Station El Chaparral, in accordance with the provisions of the technical specifications and design drawings."
In El Salvador the Executive Hydroelectric Commission of the Lempa River is putting out to tender underground excavation works for the El Chaparral hydroelectric project.
El Salvador Government Purchase CEL-LP 06/16:
"Includes the construction of underground excavations using explosives, including placement of support elements to protect these excavations, depending on the conditions of the rock, using passive anchors, umbrella liability bolts and shotcrete with or without fiber or welded steel mesh, steel trusses and transportation and final disposal of excavated material in the construction site of the hydroelectric station El Chaparral. "
The Executive Hydroelectric Commission of the Lempa River is putting out to tender strengthening of a slope and other construction works on the hydropower stations 15 de Septiembre and Cerrón Grande.
El Salvador Government Purchase CEL-LP 29/15:
The work includes the "construction and reinforcements to the works to protect adjacent embankments and dykes at the Hydroelectric station in Cerrón Grande.
The Executive Hydroelectric Commission of the Lempa River is putting out to tender open pit excavations stage II at the El Chaparral hydroelectric project.
El Salvador Government Purchase CEL-LP 33/15:
"To deliver the technical specifications, plans and maps, those interested in bidding, must sign, in front a Notary of the CEL, a Commitment Letter of confidentiality and discretion, for which it will be necessary for the legal representative of the bidding company or legally entitled person to be present.
A tender is being launched in El Salvador for the construction of river diversion ducts, supply of hydromechanical equipment, and a transmission line in the El Chaparral hydroelectric project.
Government Purchase CEL-LP El Salvador 24/15:
"CIVIL WORKS AND INSTALLATION OF A 115 KV TRANSMISSION LINE HYDROELECTRIC 15 DE SETIEMBRE - EL CHAPARRAL ', the transmission line to be built is located in the paracentral and eastern areas of El Salvador, in the departments of San Vicente, Cabañas and San Miguel, and includes construction, civil works, erection of lattice steel towers and installing one (1) circuit, one (1) conductor per phase, a 24 fiber optic cable guard, final testing and commissioning up of a new 115 KV transmission line , which will serve for electrical interconnection between the existing substation of 15 de Setiembre and the future substation El Chaparral.
The Executive Hydroelectric Commission of the Lempa River is putting out to tender mitigation works to preserve the left abutment of the hydroelectric station Cerrón Grande.
According to the specifications of the tender, the contractor must be responsible for management of technical aspects, labor, materials, tools, equipment, transportation among other things, in order to carry out mitigation works for the conservation of the left abutment of Hydroelectric station Cerrón Grande.
The Executive Hydroelectric Commission of the Lempa River in El Salvador began registering and certifying companies for the construction of the hydroelectric power plant "El Chaparral".
Some of the requirements for prequalification:
EXPERIENCE IN CONSTRUCTION CONTRACTS FOR AT LEAST TWO (2) HYDRO POWER DAMSCLOSING WITH VALUE
ADDED EQUAL OR GREATER THAN U.S. $ONE HUNDRED (100) MILLION DOLLARS.
The Executive Hydroelectric Commission of the Lempa River in El Salvador is putting out to tender the design of protective works on the slopes of the hydroelectricity stations Cerrón Grandes, 5 de Noviembre and 15 de Setiembre.
The aim of the tender is to obtain:
"STABILITY ANALYSIS AND REINFORCEMENT DESIGN WORKS AND / OR PROTECTION IN DIFFERENT SLOPES IN THE HYDROELECTRICITY STATIONS CERRÓN GRANDE, 5 DE NOVIEMBRE AND 15 DE SEPTIEMBRE."
The Executive Hydroelectric Commission of the Lempa River in El Salvador is putting out to tender the expansion of the hydroelectric 5 de Noviembre.
The aim of the expansion of the hydroelectric station 5 de Noviembre is to increase the installed capacity of the cental station by 80 MW, with two units of 40 MW each, with the aim of increasing the production of electricity using the excess water in the rainy season that the plant is not currently making use and is discharged via drains.
Salvadoran energy authorities have put out to tender feasibility studies for the installation of small hydro facilities (SHF’s)
The Executive Hydroelectric Commission of the Lempa River (CEL), is tendering:
FEASIBILITY STUDIES FOR THE INSTALLATION OF SMALL HYDROPOWER PLANTS.
The tender is for the development of feasibility studies for seven SHF’s at sites on the rivers: Sucio, Titihuapa, Suquiapa and San Simon, sites in which adequate conditions for the development of small-scale hydroelectric projects have been identified, using as a reference the main prior identification study (prefeasibility), which suggests the adding the SHF’s under an integrated scheme to the system of existing electrical power distribution.