The National Institute of Electrification of Guatemala tenders the remote access network maintenance of meters and relays.
Guatemala Government Purchase 9616101:
"The ETCEE Central System has a network for remote access to relays and meters both from its own substations and from private companies connected to the ETCEE network. Therefore, it is necessary to manage the relays and meters at any time, especially on a contingency basis.
The works of the Transmission Line 230 KV, Panama II - Chepo, circuit repowering, supply, assembly, commissioning, setting in service and civil works are tendered.
Panama Government Purchase 2018-2-78-0-08-LV-010849:
"The object of the contract includes the execution of:
Increase of the capacity of the existing Transmission Line of 230 KV, Panama II - Bayano through the change of phase conductor, insulators, fittings and accessories, for a conductor of high temperature and low arrow, lighter, that presents smaller efforts in the towers, than the existing conductor, to guarantee the transport of 600 MVA/Circuit, under maximum operating conditions ( 180°C temperature) and 645 MVA/Circuit under emergency conditions (200°C temperature), in addition to having the lowest rate of technical losses in 30 years (compared to conductors of other types, but of the same or similar diameter). The new sectioning of this 230 kV transmission line and the construction of the new Chepo Substation, conventional type, 230 KV, are also part of the object of the Contract.
In Panama, the tender documents for the design, construction and operation of the Fourth Line of Electric Transmission were published.
Panama Government Purchase 2018-2-78-0-08-LS-010847:
"The Project includes the study, design, detail engineering, construction, supply and installation, implementation, operation and maintenance of the Fourth Transmission Line Chiriquí Grande - Panama III, 500kV and associated substations.
The Central Bank of Honduras tenders the service of preventive and corrective maintenance of several electrical equipment used by the institution, for a two-year term.
Honduras Government Purchase L Public No.51-2018:
"Contracting, for a two (2) year term starting from the signing of the contract, of the preventive and corrective maintenance service for the following equipment:
In the first half of the year, Central American countries invested $164 million in purchasing electric transformers for $164 million, equivalent to a 6% increase over the same period in 2017.
Figures from the information system on the Transformers and Electrical Converters and Reactance Coils Market in Central America complied by the Business Intelligence Unit at CentralAmericaData: [GRAFICA caption="Click to interact with graphic"]
In Costa Rica, the works of the restoration project of the electrical distribution network of the Guadalupe-Moravia sector are tendered.
Costa Rica Government Purchase 2018PP-002091-ACL:
The entity calling for the public procurement process is the Compañía Nacional de Fuera y Luz, and according to the tender specifications the deadline for receiving proposals is January 16th, 2019.
The Empresa Nacional de Energía Eléctrica de Honduras tenders the national supply of different types of electrical materials.
Honduras Government Purchase LPN-100-019-2018:
"Some of the materials required:
-710,000 feet of steel wire
-230,668 meters of aluminum cable
-226,096 meters of lined aluminum
-60,000 feet of 12-gauge 3-wire TSI cable
-60,000 square washers
The works consist of the design, supply and construction of the amplification of the civil and electromechanical works in the transformer yard of the Panama substation.
Panama Government Purchase 2018-2-78-0-08-LV-010844:
" This project consists of the design, supply and construction of the amplification of the civil and electromechanical works in the 230/115/13.8 kV transformer yard of the Panama substation for the replacement of power autotransformer No. T3; it also includes the engineering and integration of the new equipment with the existing Protection and Control Automation System in the substation for the full connection of all the equipment to the National Interconnected System (SIN).
In Panama, different types of household appliances are tendered for State entities for a two-year term.
Panama Government Purchase 2018-1-27-0-99-LM-001921:
"The supply required by this public act consists of each of the products described in the Technical Specifications of the Statement of Objections. Framed within the following product categories:
The National Electric Energy Company of Honduras tenders the supply, installation and replacement of eight battery banks for the Francisco Morazán Hydroelectric Power Station.
Honduras Government Purchase LPN-100-027-2018:
"Some details of the equipment required:
48Vdc lead-acid battery banks for stationary use in floating charge systems composed of independent tubular cells with low internal resistance, which connected in series give a total floatation voltage of the bank of 49.06 volts d.c. and includes additional (thin) cells. Quantity and capacity AH.
In Honduras, the supply, installation and commissioning of fire and explosion prevention systems for power transformers for the Francisco Morazán Hydroelectric Power Plant is being tendered.
Honduras Government Purchase LPI 100-026-2018:
"The supply will include two Fire and Explosion Prevention Systems for power transformers to be installed in the transformers of Main Units N° 1 and N° 3 of the Gral.
During the first half of the year, countries in the region imported $197 million in electrical cables and wires, and 63% were bought by companies in Nicaragua, Costa Rica and Guatemala.
Figures from the information system of the Market of Wires, Cables and Other Electrical Conductors in Central America, from the Trade Intelligence Area of CentralAmericaData: [GRAFICA caption="Click to interact with graphic"]
The Costa Rican Institute of Electricity tenders the supply of power cables, boards, network materials and electrical, under the mode of delivery on demand.
Costa Rica Government Purchase 2018LA-000027-0000400001:
"Detail of some of the equipment and materials required:
-Metallic floor cabinet, type 44 RMU, static load of 650 to 700 kg, from 2100 mm to 2200 structured cabling.