In Guatemala, the Public Ministry and the Municipality of the capital are putting out to tender a supply of different types of tires for vehicles belonging to the institutions.
The air transport system will have 288 gondolas, 10 stations and will have to carry least 5,500 to 6,000 passengers per hour.
The Municipality of Guatemala has endorsed the project to grant in concession the construction, administration and operation of the "Aerometro" cable system, Phase I.
Recommendations have been made to Guatemala to update and modify the legal framework for state contracts and disclosure on public works, something that is not done officially.
These recommendations were made in the third report on transparency in the Construction Sector by the World Bank (Cost). The study notes that there is opacity in the delivery of information about buildings, as there was a reduction from 65% to 54% in key information on 17 projects covered by the research conducted in 2011.