Empresa Nacional de Energia Electrica de Honduras is bidding for the supply of household photovoltaic systems to be used in the municipalities of Corpus and Concepcion de Maria, in the department of Choluteca.
Empresa de Transmision Electrica Dominicana tenders the construction of the Jimani 138kV Substation, the contract includes the supply of all the necessary equipment for its operation.
Empresa de Transmision Electrica bids the analysis, preliminary studies and consulting services for the preparation of the environmental impact study of the project called Chiriquí Grande-Panamá III, 500 Kv operating at 230 Kv.
Panama Government Purchase 2021-2-78-0-04-LV-013730:
Empresa Nacional de Energía Electrica de Honduras is bidding for the supply, installation and commissioning of meters to be used in the Metering System of the National Transmission Network.
"The contract price will include all materials and labor required for the complete execution of the works and the correct and complete execution of the works, as well as equipment, auxiliary and protection elements, tools, auxiliary labor, and generally everything related to a complete and perfect finish of each of the energy meters to be installed in the National Transmission Grid indicated in these bidding documents, as well as any indirect costs of the works, general expenses, wages, salaries, fees, hauling of materials and any other payment required in the work.
The National Electrification Institute bids the construction of medium and low voltage distribution networks and power lines, works that will be carried out in different areas of the country.
The construction and installation of medium and low voltage electrical networks and lighting system of the Paseo del Río Avenue of the Nuevo Domingo Savio Project, Section 1, is tendered.
Empresa Nacional de Energía Eléctrica de Honduras tenders for the supervision and management of projects to expand electrical substations and build new ones.
The National Institute of Electrification of Guatemala tenders the construction of the 69 Kv transmission line that connects the Champerico electrical substation with the La Maquina substation, which has a length of 34 kilometers.
The Empresa Nacional de Energia Electrica de Honduras tenders the supply and installation of the structures in a 69 kv line section of the L-424 circuit, between the Danlí and Chichicaste substations, and a 34.5kv line section of the L358 circuit, located in San Nicolas Copan.
The National Institute of Electrification tenders the supply of equipment for insulation diagnosis, which will be used in the Central System of the Electric Energy Transport and Control Company.
The Empresa Nacional de Energia Electrica de Honduras (Honduran National Electric Power Company) is putting out to tender at the international level a high-level individual consultancy service for the preparation of specialized terms of reference and budgets to strengthen the country's electricity transmission capacity.
The National Electrical Energy Company is tendering the services for the design of the operating mechanism for the integration of the renewable energy and energy efficiency system in social housing.