Empresa Nacional de Energia Electrica de Honduras is bidding for the supply of household photovoltaic systems to be used in the municipalities of Corpus and Concepcion de Maria, in the department of Choluteca.
Honduras Government Purchase PERLA-29-LPI-B-:
"The project aims to cover the basic energy requirements of homes located in rural areas of Honduras, specifically in the communities of El Corpus and Concepcion de Maria belonging to the Department of Choluteca, being the final uses to be satisfied: lighting, cell phone charging and radio.
Empresa Nacional de Energía Electrica de Honduras is bidding for the supply, installation and commissioning of meters to be used in the Metering System of the National Transmission Network.
Honduras Government Purchase AIHMER-13-LPI-B:
"The contract price will include all materials and labor required for the complete execution of the works and the correct and complete execution of the works, as well as equipment, auxiliary and protection elements, tools, auxiliary labor, and generally everything related to a complete and perfect finish of each of the energy meters to be installed in the National Transmission Grid indicated in these bidding documents, as well as any indirect costs of the works, general expenses, wages, salaries, fees, hauling of materials and any other payment required in the work.
The National Electrification Institute bids the construction of medium and low voltage distribution networks and power lines, works that will be carried out in different areas of the country.
Guatemala Government Purchase 14005360:
"The scope of the contracting has a two-year term, during which time it is estimated to require around 1,176 works in the same number of communities.
Empresa Nacional de Energía Eléctrica de Honduras tenders for the supervision and management of projects to expand electrical substations and build new ones.
Honduras Government Purchase ENEE-61-SBCC-CF-:
"This project consists of the supervision and management of the following projects:
Tender 1
Batch 1:
1. Construction of the Simple Transmission Line in 138 KV between the Miraflores-Laínez Electric Substations
The National Institute of Electrification of Guatemala tenders the construction of the 69 Kv transmission line that connects the Champerico electrical substation with the La Maquina substation, which has a length of 34 kilometers.
Guatemalan Government Purchase 13529021:
"Lines to be contracted:
Line 1: 69 Kv Champerico - La Maquina transmission line, of approximately 34 kilometers, which includes detailed Engineering and Design, Management, Negotiation and Constitution of Easements on behalf of INDE, Supplies, Civil Works, Electromechanical Works, Dressing, Laying out, Arrowing, Tests and Commissioning of the 69 Kv transmission line.
The Empresa Nacional de Energia Electrica de Honduras tenders the supply and installation of the structures in a 69 kv line section of the L-424 circuit, between the Danlí and Chichicaste substations, and a 34.5kv line section of the L358 circuit, located in San Nicolas Copan.
The National Institute of Electrification tenders the supply of equipment for insulation diagnosis, which will be used in the Central System of the Electric Energy Transport and Control Company.
Guatemala Government Purchase 13493914:
"Some minimum requirements:
Must be a brand of recognized prestige, with a guarantee of 24 months, with an operating temperature of -200C to +550C, relative humidity for operation of <95%, supply voltage of 100 -240V ±10%, 50 / 60 Hz.
The Empresa Nacional de Energia Electrica de Honduras (Honduran National Electric Power Company) is putting out to tender at the international level a high-level individual consultancy service for the preparation of specialized terms of reference and budgets to strengthen the country's electricity transmission capacity.
Empresa Nacional de Energia Electrica de Honduras tenders for the expansion of the San Buenaventura substation.
Honduras Government Purchase ENEE-2-LPI-O:
"The scope for the expansion of the substation consists of the supply, design engineering, installation, transfers, spare parts, factory and on-site testing, and commercial operation.
The contractor will have to build a bay with two power switches that will connect to a feeder to receive the new transmission line coming from San Pedro Sula South Substation, which consists of the supply and installation of electromechanical equipment in the substation yard such as 230kV power switches, 230kV potential transformers, 230kV lightning arresters, 230kV three-pole disconnectors, metallic support structures for major and minor equipment, 230kV inductive potential transformers for the substation's own service.
The National Institute of Electrification of Guatemala tenders the maintenance work of transmission lines, of the eastern system.
Guatemala Government Purchase 11704837:
"INDE with the present negotiation will contract the Maintenance of 3,795 structures, which includes the felling, breach and removal of the easement passage of the 69 kV transmission lines, as well as the painting of a correlative number in each one of the structures of the transmission lines, and other works more.
The National Institute of Electrification of Guatemala tenders the maintenance of transformers, switches and substations of the Eastern System.
Guatemala Government Purchase 11378476:
"Lines to be hired:
-Predictive maintenance by means of analysis and physical-chemical tests to the dielectric oil of power transformers of the Eastern System.
-Predictive maintenance consisting of time measurement, contact resistance and electrical tests of power circuit breakers in the Eastern System.
In Guatemala, the Municipality of Quetzaltenango tenders the supply of power and electric energy to cover the demand of the final distribution service of the social tariff and non-social tariff.
Guatemala Government Purchase 11074337:
"Energy price: to be placed in the substations available in the municipalities. of: Quetzaltenango, La Esperanza and other points in the municipality; expressed in USD$/kWh and equivalent in Q/kWh at the exchange rate of the Banco de Guatemala (BANGUAT) on the day of the meeting of the presentation of the Offer in the Guatecompras portal.
The Municipality of Quetzaltenango tenders the conservation in the public lighting system, in streets, main avenues and Historic Center of the city.
Guatemala Government Purchase 11013788:
"The project is located within the perimeter of the urban area of the city, and has different accesses, indicating in blue the route where it will be improved for the public lighting system, then describes some of the streets and avenues that will be covered.