Empresa Nacional de Energía Electrica de Honduras is bidding for the supply, installation and commissioning of meters to be used in the Metering System of the National Transmission Network.
Honduras Government Purchase AIHMER-13-LPI-B:
"The contract price will include all materials and labor required for the complete execution of the works and the correct and complete execution of the works, as well as equipment, auxiliary and protection elements, tools, auxiliary labor, and generally everything related to a complete and perfect finish of each of the energy meters to be installed in the National Transmission Grid indicated in these bidding documents, as well as any indirect costs of the works, general expenses, wages, salaries, fees, hauling of materials and any other payment required in the work.
The National Institute of Electrification tenders the supply of equipment for insulation diagnosis, which will be used in the Central System of the Electric Energy Transport and Control Company.
Guatemala Government Purchase 13493914:
"Some minimum requirements:
Must be a brand of recognized prestige, with a guarantee of 24 months, with an operating temperature of -200C to +550C, relative humidity for operation of <95%, supply voltage of 100 -240V ±10%, 50 / 60 Hz.
The Empresa Nacional de Energia Electrica de Honduras (Honduran National Electric Power Company) is putting out to tender at the international level a high-level individual consultancy service for the preparation of specialized terms of reference and budgets to strengthen the country's electricity transmission capacity.
Empresa Nacional de Energia Electrica de Honduras tenders for the expansion of the San Buenaventura substation.
Honduras Government Purchase ENEE-2-LPI-O:
"The scope for the expansion of the substation consists of the supply, design engineering, installation, transfers, spare parts, factory and on-site testing, and commercial operation.
The contractor will have to build a bay with two power switches that will connect to a feeder to receive the new transmission line coming from San Pedro Sula South Substation, which consists of the supply and installation of electromechanical equipment in the substation yard such as 230kV power switches, 230kV potential transformers, 230kV lightning arresters, 230kV three-pole disconnectors, metallic support structures for major and minor equipment, 230kV inductive potential transformers for the substation's own service.
The National Institute of Electrification of Guatemala tenders the maintenance of transformers, switches and substations of the Eastern System.
Guatemala Government Purchase 11378476:
"Lines to be hired:
-Predictive maintenance by means of analysis and physical-chemical tests to the dielectric oil of power transformers of the Eastern System.
-Predictive maintenance consisting of time measurement, contact resistance and electrical tests of power circuit breakers in the Eastern System.
The Municipality of Quetzaltenango tenders the conservation in the public lighting system, in streets, main avenues and Historic Center of the city.
Guatemala Government Purchase 11013788:
"The project is located within the perimeter of the urban area of the city, and has different accesses, indicating in blue the route where it will be improved for the public lighting system, then describes some of the streets and avenues that will be covered.
The National Institute of Electrification tenders the supply, assembly and commissioning of ungrounded disconnectors and grounded disconnectors for the electrical substation of the Aguacapa hydroelectric plant.
Guatemala Government Purchase 11136618:
"Some specifications of the equipment required:
-Ungrounded three-pole disconnectors: Design voltage 245 Kv, operating voltage 230 Kv, central opening type, central horizontal mounting, for outdoor installation.
In Nicaragua, the supply of goods and related services of the Villa Nueva substation and civil works in the 138 Kv El Sauce - Villa Nueva Transmission Line are tendered.
Nicaragua Government Purchase 11/2019:
"Some descriptions of the supplies and works to be carried out:
Lot I: Villa Nueva Substation and Expansion of El Sauce Substation
The National Institute of Electrification of Guatemala tenders the supply, installation and commissioning of hydrating equipment for the Jurúm Marinalá hydroelectric plant.
Guatemala Government Purchase 10627634:
"The new cistern must be for water, with a minimum capacity of 80 cubic meters, leaving a differential from the level to the roof of the tank of 20 to 30 centimeters.
Empresa Nacional de Energía Eléctrica de Honduras tenders the supply, installation, testing and commissioning of specialized equipment for the Francisco Morazán Hydroelectric Power Plant.
Honduras Government Purchase PRRCH-61-LPI-O-:
"Supply, Installation, Testing, Commissioning and After-Sales Service of Four (4) Digital Static Excitation Systems for Synchronous Generator and (4) Excitation Transformers for the Francisco Morazán Hydroelectric Power Plant.
Nicaragua's Empresa Nacional de Transmisión Eléctrica tenders the supply of related goods and services to increase transformation capacity at the Ticuantepe II substation.
Nicaragua Government Purchase 12019/2019:
"Some of the equipment required:
-Auto Power Transformer 45/60/ 75 MVA 230 / 138 ± 8x1.5% /13.8 KV, 60 Hz, Yna0d11 with tap changer under load.
The National Electrification Institute tenders cells for 125 VDC battery banks, which will be used for the western system.
Guatemala Government Purchase 9616721:
"- Line 1: Supply of thirty (30) Cells for 125 VDC Battery Banks.
-Line 2: Supply of Ninety-four (94) Cells for 125 VDC Battery Banks for PER Substations.
The scope includes the supply, transportation and unloading at the ETCEE regional warehouse, in San Felipe Retalhuleu.
The National Institute of Electrification of Guatemala tenders the remote access network maintenance of meters and relays.
Guatemala Government Purchase 9616101:
"The ETCEE Central System has a network for remote access to relays and meters both from its own substations and from private companies connected to the ETCEE network. Therefore, it is necessary to manage the relays and meters at any time, especially on a contingency basis.