Empresa Nacional de Energía Electrica de Honduras is bidding for the supply, installation and commissioning of meters to be used in the Metering System of the National Transmission Network.
Honduras Government Purchase AIHMER-13-LPI-B:
"The contract price will include all materials and labor required for the complete execution of the works and the correct and complete execution of the works, as well as equipment, auxiliary and protection elements, tools, auxiliary labor, and generally everything related to a complete and perfect finish of each of the energy meters to be installed in the National Transmission Grid indicated in these bidding documents, as well as any indirect costs of the works, general expenses, wages, salaries, fees, hauling of materials and any other payment required in the work.
In Nicaragua, the supply of goods and related services of the Villa Nueva substation and civil works in the 138 Kv El Sauce - Villa Nueva Transmission Line are tendered.
Nicaragua Government Purchase 11/2019:
"Some descriptions of the supplies and works to be carried out:
Lot I: Villa Nueva Substation and Expansion of El Sauce Substation
In Panama, the construction of the 230 Kv Sabanitas - Panama III Transmission Line and associated substations is tendered.
Panama Government Purchase 2019-2-78-0-03-LP-011271:
"The contract includes the performance of the following works:
-Supply, Assembly and works related to the Construction of the Panama III Sabanitas Line, specifically from the Mocambo sector where the Panama III Substation will be located to Sabanitas, Colón where the Sabanitas Substation will be located.
The Empresa Nacional de Transmisión Eléctrica de Nicaragua tenders the construction of distribution networks in rural electrification projects.
Nicaragua Government Purchase 11111/2019:
"The work consists of the construction of Primary and Secondary Distribution Networks in 700 communities distributed in Sector North 1 - Estelí with 83 communities, Sector North 2 - Jinotega with 206 communities, Sector North 3 - Madriz with 117 communities, Sector North 4 - Matagalpa with 169 communities and Sector North 5 - Nueva Segovia with 125 communities, divided into five lots respectively.
Arguing that none of the two proposals received meets the mandatory minimum requirements, in Panama it was decided to disqualify companies interested in building the Fourth Transmission Line.
At the ceremony held on April 9, two of the five pre-qualified contractors submitted their technical and economic proposals for the execution of the project, which consists of the design, construction, supply and installation, commissioning, operation and maintenance of the Fourth Chiriquí Grande - Panama III 500kv Electric Transmission Line and associated substations.
In Panama, ASEP approved the reconsideration request presented by Etesa, opening the way to continue with the tender process for the Fourth Transmission Line.
Last week, it was reported that to continue with the tender process, the Public Services Authority (Asep) had requested from the Electric Transmission Company (Etesa) a justification for the development of the construction project and operation of the Fourth Transmission Line.
To continue with the tender process of the Fourth Transmission Line, ETESA will have to better justify the real need of the project and define the optimal date of entry into operation.
To continue with the tender process, the Public Services Authority (Asep) has requested from the Empresa de Transmisión Eléctrica (Etesa) a justification for the development of the construction project and operation of the Fourth Transmission Line.
The works of the Transmission Line 230 KV, Panama II - Chepo, circuit repowering, supply, assembly, commissioning, setting in service and civil works are tendered.
Panama Government Purchase 2018-2-78-0-08-LV-010849:
"The object of the contract includes the execution of:
Increase of the capacity of the existing Transmission Line of 230 KV, Panama II - Bayano through the change of phase conductor, insulators, fittings and accessories, for a conductor of high temperature and low arrow, lighter, that presents smaller efforts in the towers, than the existing conductor, to guarantee the transport of 600 MVA/Circuit, under maximum operating conditions ( 180°C temperature) and 645 MVA/Circuit under emergency conditions (200°C temperature), in addition to having the lowest rate of technical losses in 30 years (compared to conductors of other types, but of the same or similar diameter). The new sectioning of this 230 kV transmission line and the construction of the new Chepo Substation, conventional type, 230 KV, are also part of the object of the Contract.
In Panama, a tender has been launched for the transportation, delivery and installation of the materials and equipment, for electrical distribution lines in different parts of the country.
Panama Government Purchase 2018-0-03-0-11-LV-031453:
"Supply, transport, delivery of materials and equipment for the design and installation of the electrical distribution line, transformers, support walls, electrical connections, internal electrical installations and public lighting in the communities of Cémaco and Taimatí and Río Bonito - Barriales.
In 2017, purchases of electric wires and cables from Central American countries totaled $791 million and grew by 74% with respect to the previous year, in contrast to the fall recorded between 2015 and 2016.
Figures from the information system of the Market of Wires, Cables and Other Electricity Conductors in Central America, compiled by the Business Intelligence Unit at CentralAmericaData: [GRAFICA caption = "Click to interact with graph"]
From January to September 2017, countries in the region imported $229 million worth of electrical transformers, and 43% were purchased by companies in Costa Rica and Panama.
Figures from the information system "Market for Electric Transformers and Converters and Reactor Coils in Central America" , compiled by the Business Intelligence Unit at CentralAmericaData: [GRAFICA caption = "Click to interact with graph"]
The Ministry of the Presidency of Panama is putting out to tender a supply of equipment for the construction of electricity distribution lines in the provinces of Panama, Colón and Darién.
Panama Government Purchase 2018-0-03-0-99-LV-029970:
"Supply, transportation and delivery of materials and equipment for the design and installation of an electricity distribution line, transformers, fences, electrical connections, internal installations and public lighting for different communities in the provinces of Panama and Colon."
The Ministry of the Presidency of Panama is putting out to tender the supply, transport and delivery of materials and equipment for the installation of distribution lines.
Panama Government Purchase 2018-0-03-0-99-LV-029839:
"Supply, transportation and delivery of materials and equipment for the design and installation of the electrical distribution line, walls, transformers, electrical connections, internal installations and public lighting for different communities located in the provinces of Panama West and Coclé."
The Electricity Transmission Company of Panama is putting out to tender the supply, assembly and commissioning of the Burunga substation.
Panama Government Purchase 2017-2-78-0-15-LP-008787:
"The contract includes the implementation of the project "Supply, Assembly, Commissioning, Commissioning and Civil Works for the Burunga Substation", which consists of the following sub-projects: