The Autonomous Executive Port Commission of El Salvador is putting out to tender the construction and installation of an electrical substation at the Monsenor Romero International Airport.
Government Purchase El Salvador DR-CAFTA-ADACA-UE CEPA-LA-13/2017:
"The purpose is to contract the work of Construction of Sub-Station Maneuvering and Supply and Installation of an Electrical Sub-Station for the Passenger Terminal of the International Airport of El Salvador, Monsignor Óscar Arnulfo Romero y Galdámez, according to everything stated in the technical specifications, plans, etc., by means of a Natural Person, Legal and / or Union of Bidders, National or Foreign.
The Quetzal Port Company is putting out to tender a supply of electricity and power with its respective connections, repairs and maintenance.
Guatemala Government Purchase 6380352:
"The point of delivery of electricity and power will be made in the busbars of the 69 KV substation owned by the EPQ located inside the port area.
A new electric meter must be installed, which must be approved by the Wholesale Market Manager and comply with the minimum standards of the commercial metering system set for this type of voltage.
Instituto Nacional de Electrificación de Guatemala is putting out to tender a supply of 14 remote terminals for high voltage substations.
Guatemala Government Purchase 6604382:
"The INDE wishes to contract the supply, transportation and unloading of 14 remote terminal units for high voltage substations, which includes all the activities and resources needed to meet technical requirements.
The National Electrification Institute of Guatemala is putting out to tender a supply of voltage regulators and transformers for hydroelectric power plants.
Guatemala Government Purchase 6559379:
"Requirements are for the supply of 3 13.8 kV voltage regulators for the Western System.
The Contractor must supply all equipment, accessories, materials and other things necessary for the correct installation, integration tests and operation of the equipment offered, which must comply with the following minimum specifications required by ETCEE.
The Electricity Transmission Company of Panama is putting out to tender the supply, assembly and commissioning of the Burunga substation.
Panama Government Purchase 2017-2-78-0-15-LP-008787:
"The contract includes the implementation of the project "Supply, Assembly, Commissioning, Commissioning and Civil Works for the Burunga Substation", which consists of the following sub-projects:
Empresa de Transmisión Eléctrica de Panamá is putting out to tender civil works and commissioning of electrical equipment.
Panama Government Purchase 2017-2-78-0-99-LP-008774:
"Assembly, commissioning, putting into operation and civil works on power transformers in the substations of Panama, Llano Sánchez, Mata de nance and Progreso."
Empresa de Transmisión Eléctrica de Panamá is putting out to tender work to increase capacity of the transmission lines Mata de Nance - Veladero and Guasquitas - Veladero.
Government Purchase Panama 2017-2-78-0-99-LP-008767:
"Supply, assembly and works related to increasing the capacity of the existing line Mata de Nance - Veladero 230 KV: the driver of the Transmission Line Mata de Nance - Veladero (lines 230-5B / 6C) will be changed to a special high-temperature, low-sag (HTLS) conductor. The scope of work is described in the Standard Specifications, Chapter III, Part 2, Technical Specifications, Transmission Lines.
The Instituto Costarricense de Electricidad is putting out to tender a supply of electrical equipment and materials for the Tejar and Higuito substations, and associated transmission lines.
Government Purchase Costa Rica 2017LI-000002-PROV:
"Requirement for equipment and materials for S.T. Tejar (extension No. 1), S.T. Higuito and L.T. asociada.
The Electricity Transmission Company of Panama is putting out to tender the supply of firm power and energy for isolated systems for a period of 12 years.
Government Purchase Panama LPI ETESA 01-17:
"Recruitment of Firm Power and Energy Requirement for Isolated Systems Located in the Province of Darién, Guna Yala Region, Las Perlas Archipelago and San Blas Archipelago, for the period from September 1, 2018 to June 30, 2030.
The National Electrification Institute in Guatemala (Instituto Nacional de Electrificación) is putting out to tender a supply of banks and chargers for substations.
Empresa Nicaragüense de Electricidad is putting out to tender the supply and construction of a solar - thermal hybrid system in the Municipality of San Juan de Nicaragua.
Nicaragua Government Purchase 6/2017:
"The project corresponds to the National Sustainable Electrification and Renewable Energy Program, it will be conducted through the International Competitive Tender procedures established by the Inter-American Development Bank.
The Instituto Costarricense de Electricidad is putting out to tender the supply, according to demand, of single-phase pole type distribution transformers.
Costa Rica Government Purchase 2017LA-000009-0000400001:
"Details of the types of transformers:
-single-phase pole type distribution transformer, auto protected 34,5 / 19,9 kv, 120/240 v 10 kva (TQ-1).