The National Institute of Electrification tenders the supply of equipment for insulation diagnosis, which will be used in the Central System of the Electric Energy Transport and Control Company.

Monday, October 19, 2020

Guatemala Government Purchase 13493914:

"Some minimum requirements:

Must be a brand of recognized prestige, with a guarantee of 24 months, with an operating temperature of -200C to +550C, relative humidity for operation of <95%, supply voltage of 100 -240V ±10%, 50 / 60 Hz.

-ANSI American National Standards Institute
-IEEE Institute of Electrical and Electronic Engineers
-IEC International Electrotechnical Commission
-NEC National Electrical Code
-NESC National Electrical Safaty Code
-ASTM American Society for Testing and Materials
-IEEE C57.161-2018 Guide for Dielectric Frequency Respose Test Equipment must comply with the latest revision of these applicable standards."

Deadline for receipt of offers: December 15, 2020.

See tender (in Spanish).

¿Le interesan las licitaciones en Centroamérica?

Reciba a diario alertas sobre las principales compras de los gobiernos de la región.








this site is protected by reCAPTCHA and Google's privacy policy and terms of service.
Need assistance? Contact us
(506) 4001-6423


More on this topic

Electrical Transmission Line Construction

October 2020

The National Institute of Electrification of Guatemala tenders the construction of the 69 Kv transmission line that connects the Champerico electrical substation with the La Maquina substation, which has a length of 34 kilometers.

Guatemalan Government Purchase 13529021:

Tender: Electrical Works

January 2018

The National Electrification Institute of Guatemala is putting out to tender the expansion and improvement of the substation Guatemala Norte.

Guatemala Government Purchase 7403623:

"The contract includes design and detailed engineering, civil works, electromechanical work, equipment supply, assembly, wiring, connection, testing and commissioning a three-phase reactor of 20 MVAR 230 KV, to connect to the substation bus through the construction of a connection field with double bar configuration, according to the reference plans contained in the annexes. 

Tender: Electrical Equipment for $4 million

July 2016

Tender for the supply, transportation and delivery of materials and equipment for the installation of electricity distribution lines in different communities in the province of Veraguas, Panama.

Panama Government Purchase 2016-0-03-0-09-LV-021 970:

Guatemalan Grid to be Extended with 850 km of lines

May 2012

Investment by Grupo Energía de Bogotá, for an 850km extension, will amount to about $357 million and works must conclude in October 2013.

The extension of the transmission electricity network in Guatemala by 23% with the addition of 850 km of new 230 kilovolts lines, is being managed by the Colombian company Grupo Energia de Bogota, which won a tender issued in 2009.

 close (x)

Receive more news about Electrical equipment and supplies

Suscribe FOR FREE to CentralAmericaDATA EXPRESS.
The most important news of Central America, every day.

Type in your e-mail address:

* Al suscribirse, estará aceptando los terminos y condiciones


Looking for Importers and distributors of furniture

Mexican manufacturer of office furniture seeks importers and distributors interested in dealing their products in Central America.
PM Steele is a 100% Mexican company, with more than 67...

Stock Indexes

(Apr 6)
Dow Jones
-5.60%
S&P 500
-5.10%
Nasdaq
-5.64%

Commodities

(Dec 2)
Brent Crude Oil
47.000
Coffee "C"
118.15
Gold
1,811
Silver
23.800