Tender for Power Generating Equipment for $1,500,000

The Instituto Costarricense de Electricidad is putting out to tender power plants for machinery, equipment and workshops.

Thursday, October 11, 2012

Details of equipment to be tendered:

125 kW ELECTRICAL GENERATOR, three phase 480/277V, 560HZ C / 4 STROKE COMBUSTION ENGINE

300 kW ELECTRICAL GENERATOR, three phase 480/277V, 560HZ C / 4 STROKE COMBUSTION ENGINE

600 kW ELECTRICAL GENERATOR, three phase 480/277V, 560HZ C / 4 STROKE COMBUSTION ENGINE

Also being tendered are services for commissioning and training.

The scheduled date for receipt of bids is November 8, 2012.

¿Busca soluciones de inteligencia comercial para su empresa?



More on this topic

Wärtsilä supplies 378 MW power plant to El Salvador

October 2015

Wärtsilä has been contracted to supply a major Flexicycle power plant to Energía del Pacífico S.A. in Acajutla, El Salvador. It will be the largest and most efficient power plant in El Salvador, and the first in Central America to be fired by LNG-based natural gas.

The order is estimated to be included in Wärtsilä’s order book in 2016, and the plant completion is scheduled for 2018.

Tender for Operation of Power Plant for $2 million

November 2014

Empresa de Generación Eléctrica de Panamá is putting out to tender the operation and maintenance of a the Turbinas de Gas power plant, located in the area of ​​the substation Panama, with an installed capacity of 40MW.

Panama Government Purchase 2014-2-73-0-08-AV-000681:

Tender For Emergency Power Plants

August 2012

The Public Ministry of Guatemala is putting out to tender the purchase and installation of twenty (20) emergency power plants.

Details of the plants to be tendered:

12 KVA Power Plant
15 KW Power Plant
20 KW Power Plant
30 KW Power Plant
45 KW Power Plant

The date for submission of bids is October 2, 2012 at 09:00:00 am

Costa Rica: Power Plant Tender for $4.7 million

July 2011

The national bank is putting out to tender the purchase and installation of 30, 50, 80 and 100 KVA tri-phasic power plants.

According to the specifications of the tender:

Banco Nacional de Costa Rica, requires the "purchase and installation of 30, 50, 80 and 100 KVA, tri-phasic diesel power plants, with deliveries on demand, for a period of four (04) years for installation or replacement due to obsolescence in new offices.

ok