Of the 34,629 GWh generated in 2015 by the countries included in SICA, 68% came from hydropower, 11% from cogeneration in sugar mills, 11% was geothermal, 9% wind and 0.1% based on biogas.

Tuesday, August 16, 2016

From a report by Cepal entitled "Statistics of electricity production by countries in the Central American Integration System (SICA)":

In 2015 production of electricity in the eight countries in the Central American Integration System (SICA) amounted to 64,076 GWh, an amount that has been broken down into the following percentage shares: The Dominican Republic (23.3%); Costa Rica (16.7%); Guatemala (16.1%); Panama (14.8%); Honduras (13.2%); El Salvador (8.8%); Nicaragua (6.5%) and Belize (0.5%).

The installed capacity of the sub-region was 18,744 MW, of which 19.9% was installed in Guatemala; 19% in the Dominican Republic; 16.4% in Costa Rica; 15.9% in Panama; 12.3% in Honduras; 8.7% in El Salvador; 7.1% in Nicaragua and 0.8% in Belize.

Read full report.

Do you need more information about your business sector?

Request more information:









this site is protected by reCAPTCHA and Google's privacy policy and terms of service.
Need assistance? Contact us
(506) 4001-6423


More on this topic

Central America: Which Country Has the Most Expensive Energy?

January 2018

In 2016, the average cost of 1 kWh in Central America was 13.48 cents, while in Costa Rica, it was 18.47 cents.

A report from the CEPAL indicates that in 2016, the average cost of one kilowatt hour (kWh) in Central America was 13.48 cents, while in Costa Rica it was 18.47 cents; 37% more for industrial consumption of 100,000 kWh. In El Salvador and Guatemala, it was 11.03 and 11.54 cents respectively. In Panama, 10.92 cents. 

Analysis of Electricity Sector in Central America

July 2014

In 2013 63% of the electrical energy fed into the transmission networks in the region was generated from renewable sources.

From a report entitled "Central America: production statistics for the electricity subsector, 2013", prepared by the Economic Commission for Latin America and the Caribbean (ECLAC):

Guatemala Updates Electricity Expansion Plan

January 2012

By 2026, the country will generate 78% of its energy from renewable sources.

The changes proposed to the Generation System Expansion Plan 2012-2026 have already been approved by the Ministry of Energy and Mines (MEM).

In 2012, it is is expected to generate 50.5% from hydroelectric sources, 3.6% from geothermal sources, 3.5% from bunker fuel, 12% from biomass, 9% from the electrical interconnection with Mexico and 21.3% from coal.

Central American Electric Power Statistics

May 2010

CEPAL published statistics on Central America’s energy sector up to 2009.

Electric energy production reached 39.114 GWh for the six Central American countries, 0.1% less than 2008. This is due to less energy consumption caused by economic deceleration. Energy consumption dropped in El Salvador (-3%), Honduras (-1.3%) and Costa Rica (-1%), while it increased in Panama (7.3%), Nicaragua (4.3%) and Guatemala (1%).