Public Office Construction Announced

In Costa Rica, it is expected to invest $5 million in the construction of the new building of the Municipality of Santa Cruz, in Guanacaste, which will have an area of 10 thousand square meters.

Monday, October 29, 2018

From the press release of the Institute of Development and Municipal Advisory of Costa Rica:

Friday, October 26th, 2018. The Santa Cruz Municipal Council approved the design carried out by the Technical Services and Financing Unit of the Institute of Development and Municipal Advisory for the construction of its new municipal building. The total cost of the work is around ₡ 3000 million for an estimated area of 10 thousand square meters.

The project consists of four buildings for municipal offices and another one level for offices of the Municipal Council, which will be connected by open-air corridors. In addition to the service platform, the ground floor will house a series of shopping areas, restaurants, cafés, a multi-purpose plaza and meeting spaces for citizens; it also has entertainment areas for children and parking for bicycles.
Marcela Guerrero, executive president of IFAM said that "We want to offer a solution tailored to each municipality and adapted to its environment, in this sense, we take into account that Santa Cruz is one of the districts that receives the most hours of sunshine per year, so we proposed a building that takes advantage of the characteristics of Santa Cruz in aspects such as climate change adaptation, reduction of energy consumption and generation through alternative methods such as solar panels."

The IFAM technical team included other aspects in the design based on the maximum use of light and natural ventilation, a system of reuse of rainwater and sewage for irrigation of gardens and sanitary services.

IFAM architect, Eduardo Picado, said that "The project for the new building of the Municipal Palace and the Santa Cruz Council is based on the local history of Chorotega and its artistic contribution, which evolves and transforms to integrate the past, present and future of this community. Through a sustainable proposal of public, commercial, cultural and administrative spaces for the development of the county."

"After the earthquake we had to hurry to rent 5 or 6 different buildings as a temporary measure, now it is a problem for the coordination, teamwork, work and mainly attention to our public that sometimes has to walk up to 1 km when they are in the wrong office," said Maria Rosa Lopez, mayor of Santa Cruz.

This decision was taken by the Municipality after the National Emergency Commission declared the previous building uninhabitable due to the damage to its infrastructure subsequent the Nicoya earthquake in September 2012. Since then, as a provisional measure, 5 offices have been rented in different buildings in the center of the region in order not to interrupt the functions, causing functional inconveniences.



More on this topic

El Salvador: $23 million Shopping Center

June 2016

Construction has started in Santa Ana of a building measuring 16 thousand square meters which will make up the second stage of Metrocentro, which will be ready in March 2017.

The second stage of the mall by Grupo Roble will have 75 new stores, distributed in 10,200 of the 16,000 total square meters comprising the new area. The works started on June 29 and will be developed over the next 15 months.

Panama: Constructions in Ancon Halted

October 2015

Floods that have caused serious damage are forcing a review of the geology of the area and its ability to support new infrastructure.

While preparations are being made for a new general plan of pending and existing works, the Municipality of Panama has suspended permits for 50 residential, commercial and mixed building constructions in Ancon.

Costa Rica: There is no water but they keep building anyway

June 2015

Just days after it was announced that due to lack of water no more permits would be issued for building in one of the most in demand tourist areas, the Mayoral office has backtracked and said that "it is not necessary to stop construction."

Downplaying the problem of overexploitation of the aquifer in Santa Cruz, the City Council has overturned the decision made days ago to prohibit the issuance of building permits in Tamarindo, Tempate and Cabo Velas, saying now that it is not necessary to stop building as solutions are being sought to the problem of water shortage affecting the area, as revealed by a report by the National Service for Groundwater, Irrigation and Drainage (Senara).

Confusion Over Limits for Real Estate Development

May 2012

The official proposals for defining urban areas in the Greater Metropolitan Area in Costa Rica, contains contradictions and generates uncertainty.

A second proposal for the Land Use Plan of the GAM (Potgam in Spanish), which has been released for public consultation by the Ministry of Housing and Human Settlements (MIHAS in Spanish), has generated more controversy and confusion over the new limits for an urban containment radius .

 close (x)

Receive more news about Infrastructure & Construction

Suscribe FOR FREE to CentralAmericaDATA EXPRESS.
The most important news of Central America, every day.

Type in your e-mail address:

* Al suscribirse, estará aceptando los terminos y condiciones


STOfficenter

Organization that operates in El Salvador.
Phone: (503) 22686400

Company Profile

Stock Indexes

(Apr 6)
Dow Jones
-5.60%
S&P 500
-5.10%
Nasdaq
-5.64%

Commodities

(Nov 26)
Brent Crude Oil
47.77
Coffee "C"
117.15
Gold
1,812
Silver
23.355