The site in Santa Ana will be put out to tender and should be under construction in 2015; its installed capacity will be 42 MW.
The Executive Hydroelectric Commission of the Lempa River (CEL) is looking to build a wind farm in the municipality of Metapan, Santa Ana, where 28 wind turbines each producing 1.5 megawatts, will be installed, which together will eventually generate a total of 42 megawatts , which translates to 126.5 GWh of energy per year, reported Laprensagrafrica.com.