The Dutch company Van Oord - Bam will be in charge of dredging about 220 thousand cubic meters of sand and silt in the port terminal of Moín in Limón, Costa Rica.
In order to allow the transit of ships with larger drafts, the Port Administration and Economic Development Board of the Atlantic Coast (Japdeva), signed a contract for the dredging work, which will take about three months and should be done at the same time as the operation of the port terminal.
After overcoming several bureaucratic obstacles the grain terminal with capacity to accommodate PostPanamax vessels became operational in the Pacific port of Costa Rica.
From a statement issued by from the Ministry of Public Works and Transportation (MOPT):
The new multipurpose dock at Caldera Port, has now been inaugurated, improving Costa Rica's competitiveness and international trade logistics, in addition to promoting development in the province of Puntarenas.