Tender: Electricity Works for $81 million

Panama is inviting bids for supply and services for the repowering of the Panama II-Chepo Line and the new LT Chepo -Meteti, 230kV and associated substations.

Thursday, August 11, 2016

Panama Government Purchase 2016-2-78-0-08-LP-007309:

"This contract includes the completion of the project called "Transmission Line Panama II-Chepo-Metetí -230 KV "consisting of:

-Supply of materials for the repowering of the LT Panama II-Chepo: changing the conductor of the Panama II transmission line to the area of Chepo (lines 230-1A / 1B, 230-2A / 2B), to a high operating temperature trapezoidal conductor 714MCM ACCC Dove. This conductor will have a capacity of 600MVA / circuit at a temperature of 180°C and 645MVA / circuit at 200°C . The existing towers will be used.

-Construction of line Chepo-Metetí 230 KV single circuit on towers, with capacity for a second circuitA 714 MCM ACCC Dove conductor will be used.

-Supply, assembly, commissioning, putting into service and civil works for the construction of the new substation Chepo 230 KV, in breaker and a half scheme, which will consist of three units of 230 KV, two of them with three (3) switches for connection of the double circuit transmission line from Panama II and the existing double circuit line coming from Bayano: and a unit of two (2) switches for the output of the new single circuit to Metetí.

-Supply, assembly, commissioning, putting into service and civil works for the construction of the new substation  Metetí 230 KV in breaker and a half scheme, with two units: the first of three (3) switches for connection of the new single circuit transmission line from the S / E Chepo and the connection with the transformer belonging to ENSA for distribution in the area. The second with two switches to complete the scheme for the substation, initially operating in a ring.

Reference value: $81.475.000 

The deadline for receipt of bids is October 11, 2016.

¿Busca soluciones de inteligencia comercial para su empresa?

Are you interested in tenders in the region?

Receive daily alerts about major purchases by governments in Central America.

Find out more:









this site is protected by reCAPTCHA and Google's privacy policy and terms of service.
Need assistance? Contact us
(506) 4001-6423


More on this topic

Tender for $26 Million in Electrical Works

December 2018

The works of the Transmission Line 230 KV, Panama II - Chepo, circuit repowering, supply, assembly, commissioning, setting in service and civil works are tendered.

Panama Government Purchase 2018-2-78-0-08-LV-010849:

"The object of the contract includes the execution of:

Tender: Electricity Works for $10 million

July 2017

The Electricity Transmission Company of Panama is putting out to tender the supply, assembly and commissioning of the Burunga substation.

Panama Government Purchase 2017-2-78-0-15-LP-008787:

"The contract includes the implementation of the project "Supply, Assembly, Commissioning, Commissioning and Civil Works for the Burunga Substation", which consists of the following sub-projects:

Tender: Electricity Works for $108 million

January 2017

The Electricity Transmission Company of Panama is putting out to tender various construction works for new lines and substations, and upgrading and increasing capacity of existing lines.

Panama Government Purchase 2016-2-78-0-99-LP-007970:

Tender for Electricity Transmission Lines in Guatemala

July 2014

An announcement has been made that the conditions for the tender for 574 kilometers of power lines will be released on July 31.

The work comprises of "... 29 new substations, expansion of 25 new lines and more than 12 adaptations, establishing 574 kilometers of electricity transmission, divided into 5 lots covering the national territory."

ok