Costa Rica Launches $ 4 Million Tender For Reconstruction of Bridges

The National Emergency Commission invited companies to bid for the reconstruction of 11 bridges in the province of Limón.

Tuesday, February 8, 2011

Preliminary studies and design of the bridges was done by the Department of Bridges, Public Works and Transportation, an entity that in turn will be the Executing Unit of the works which are performed by the Division of Public Works.

After this process, the Board approved the investment for the reconstruction of these bridges that were damaged by floods, in the areas of Pococí, Guácimo, Siquirres and Matina

In Pococí it was approved the construction of bridges over the La Zota, Palacios and Reventazon rivers.

In Guácimo, works will be carried out on the San Bosco, San Luis and Guácimo rivers.

In Siquirres, works will take place on bridges located on Maryland, Las Cabras and Seis Amigos rivers and in Matina on bridges over rivers Banasol and Malcriado.

More on this topic

Tender: Vehicle Bridge for $12 million

July 2017

The Ministry of Public Works in Panama is putting out to tender the design and construction of a vehicular bridge in the province of Coclé.

Panama Government Purchase 2017-0-09-0-02-LV-005100:

"The project consists of the construction of a Road Interchange, which will allow the direct connection of Damián Carles Avenue, La Esperanza Avenue (Via Aeropuerto) after its intersection with the Pan American Highway, in addition to the construction of two pedestrian bridges, Renovation of roads and other specified works, however, the Bidding Entity may detect tasks whilst working in the field, that have not been defined in the terms of reference and the plans, in order to ensure the connectivity and integrality of road networks and / or accessibility to basic services.

Prequalification for Fourth Bridge Project in Panama

November 2015

The process to select the right company for the design and construction of the fourth bridge over the Canal will include a prequalification process.

In order to develop a fair and transparent process, the Cabinet has authorized the Ministry of Public Works (MOP) to carry out a prequalification process of companies for the design and construction of the fourth bridge over the Panama Canal.

Third Bridge Over Canal to be Tendered in August

March 2012

With 4 lanes, and measuring 4.6 kilometers long and 75 meters high, the bridge will cost about $280 million and its construction will take 32 months.

The tender for the third bridge, located on the Atlantic side, will take place in August, according to the outgoing administrator of the Panama Canal, Alberto Alemán Zubieta.

Construction of Bridge Over San Juan River Starts

December 2011

With an investment of $30 million, construction has begun on the 360 meter bridge which connects Nicaragua to Costa Rica by road.

A press release from El Pueblo Presidente reads:

The 360-meter bridge over the Rio San Juan connects Nicaragua to Costa Rica. Construction of the bridge has begun and is being managed by the Japanese International Cooperation Agency (JICA).

 close (x)

Receive more news about Infrastructure and Construction

Suscribe FOR FREE to CentralAmericaDATA EXPRESS.
The most important news of Central America, every day.

Type in your e-mail address:

* Al suscribirse, estará aceptando los terminos y condiciones


Citrus Extract

CitroBio is a citrus extract wash for use throughout the entire food industry.
CitroBio is a citrus wash for sprouts, fruits,...

Stock Indexes

(Aug 30)
Dow Jones
-0.07%
S&P 500
0.14%
Nasdaq
0.38%

Commodities

(Aug 30)
Brent Crude Oil
51.370
Coffee "C"
127.05
Gold
1,310
Silver
17.435